Before projects are transferred to the directory tree of the PARTdata Manager or receive status 5 under SVN administration (see PARTprojectQA under Section 6.5.4.2.4, “Level 4”), you can or must have the innovations or changes contained therein checked for possible errors with an automatic test run. There is a wide range of test criteria to choose from.
The call is made in PARTproject under Project selection, in the context menu of projects ( Test project ) or directories (Test [Test directory] directory).
-> The QA Check Settings dialog box opens with the General, Tests, Output and Plugins tab pages.