The carrier is now to be transferred to the superstructure [Assembly].
Define a rule for the connection between "dummy starter part" and "double T-beam".
Call up the context menu command New rule on the attachment point of the dummy start part (cp_dummy_traeger).
Select the support (
din_1025_s
) as the connection part andIP1
as the connection point.Activate Reverse direction and Exclusive, select Allow automatic assembly [Permit automatic build] in the list field.
Insert the carrier in the docking window Structure [Assembly].
At the moment, an error message still appears because it is not defined which characteristic of the carrier should be selected for which table line in the dummy start part. The assignment between the two tables is missing.
The problem is solved by inserting a corresponding condition. See next section.