4.24.8.2.7.1. Change standard descriptions according to project

Assign the standard description (NB) for individual projects differently from the standard defined NB if desired.

Complicated naming rules could previously only be solved using an external vbs script.

In PARTlinkManager, the Edit project table command is available in the directory tree at project level.

After activation, the Edit table window opens.

Edit project table

Edit project table

Select the NB line in the list field of the VKEY key.

You can now define any NB under VVALUE. Here in the example my_NB_$D.

Address variables with $Variable.. Please refer to Section 6.1.3, “Constants ” for possible variables. All ERP variables are also possible.

Proceed in the same way for SHORTNB or LINA.