4.15.3.1. Catalog update (Tutorial) - Example 1

When using an ERP integration, in the LinkDB, datasets are assigned to a certain project row (project path + LineID).

At catalog updates it may happen that not all LinkDB connections for each project can be found due to changes.

[Note]Note
  • You will find the sample files for this tutorial in your installation under $CADENAS\training\update_manager.

  • The "ecat" role from the demo database was used for text and images. For the "classic" red/green display, the corresponding settings were made under Status colors for catalog index.[75]

  • In this example, the following setting was used for the export condition [Export condition].[76]

    (ERP_PDM_NUMBER.NE.'')

    The traffic light is therefore green if an ERP_PDM_NUMBER is available.